This publication provides introductory technical guidance for civil engineers, mechanical engineers, electrical engineers and other professional engineers, construction managers and electric utility operators interested in sizing of hydroelectric power plants and their integration into electric utility systems. Here is what is discussed: 1. INTRODUCTION, 2. PROCEDURE FOR SIZING POWERPLANTS, 3. POWER SYSTEM REQUIREMENTS AND MARKETABILITY CONSIDERATIONS, 4. PHYSICAL CONSTRAINTS, 5. ENVIRONMENTAL AND NON-POWER OPERATING CONSTRAINTS, 6. SELECTION OF ALTERNATIVE POWER INSTALLATIONS, 7. DEPENDABLE CAPACITY, 8. INTERMITTENT CAPACITY, 9. FLEXIBILITY, 10. MEASURES FOR FIRMING UP PEAKING CAPACITY, 11. HOURLY OPERATION STUDIES,
- | Author: J. Paul Guyer
- | Publisher: CreateSpace Independent Publishing Platform
- | Publication Date: Dec 01, 2016
- | Number of Pages: 82 pages
- | Language: English
- | Binding: Paperback
- | ISBN-10: 1540753166
- | ISBN-13: 9781540753168